COMPANY INTRODUCE            

Shandong Zeyu, is the professional production tower crane company. To  "produce quality products, build high-quality brand, the customer is  always satisfied with their own never satisfied" for the idea of  continuous growth and development.

Now the company  covers an area of 70,000 square meters, a total of more than 500  employees, registered capital of 20 million yuan. Our  production tower crane experience, complete technical information, with a  set of high-quality high standards of production lines, product quality  in full compliance with national and international standards, has been  named the provincial and municipal "level of credibility ......


                                                                   
                                   

                                     
                                   

NEWS

NEWS

  • 2019-11-14
    First, we must maintain the cage door and landing door of the construction hoist, because many faults occur on these doors. We should apply oil to the door sill frame to lubricate it well, so that the hoist will not make strange noises during use. We should also check the switch of the safety touch
  • 2019-11-12
    As China’s urbanization accelerates, tower cranes are used more and more, and the safe use of tower cranes has become an important part of safe construction in China’s urbanization. In order to install tower cranes safely, ensure safe construction, and carry out tower crane operations safely, the fo
  • 2019-11-11
    Before leaving the factory, the hoist has been inspected, adjusted, and tested, and all technical indicators meet the design requirements. When in use, it is only necessary to connect the power supply; the hydraulic and electrical systems do not need adjustment. The following points must be noted du
  • 2019-10-28
    The selection of wire ropes for construction hoists shall comply with the provisions of the current standard Steel Wire Ropes GB/T 8918. The maintenance, inspection, and discarding of wire ropes shall comply with the provisions of the current standard Practical Code for Inspection and Discard of Wir
  • A construction hoist is a vertical lifting machine installed on the exterior of a building for transporting construction personnel and building materials. Construction practice has proven that using construction hoists for the vertical transportation of personnel and materials in high-rise construct
  • For base-frame fixed self-erecting tower cranes, a block-type reinforced concrete foundation is most suitable. On foundations with relatively high soil bearing capacity, the dimensions of such concrete foundation blocks may be taken as 200 cm × 200 cm × 50 cm, and both the top and bottom of the bloc
  • For all industries, safety work must be done well. For high-risk operations such as construction elevators, it must not be neglected. According to surveys, the results show that overloading is one of the main causes of construction elevator accidents. Today we will discuss how to improve the safety
LINKS: Baidu      360      Alibaba